Acclimation brings the flooring into equilibrium with the room. The material expands and contracts with temperature, and to a smaller extent with humidity, so a plank that is at 8 °C in a van and 24 °C in the building is a different size from the one that will be installed into a set of joints that have almost no working clearance.
It is not drying, and it is not curing. Vinyl does not need to lose moisture, and a rigid core does not need time to settle. What it needs is to stop changing size, and the only reliable signal for that is the material's own temperature, not a calendar.
This is also where a rigid core differs from the flexible products it replaced. The mineral-filled SPC core is significantly more dimensionally stable than a wood-based laminate core, which is why some instructions for SPC rigid core are shorter than the traditional forty-eight hours. The surface layer and the joint still move, though, and the requirement is never zero.
The table below summarises what the market commonly asks for. The specific figure for any product comes from its own installation instruction, which is the document that governs a claim.
| Construction | Typical acclimation | Why it needs the time | If it is skipped |
|---|---|---|---|
| Laminate, wood-based core | 48 hours, sometimes 48–72 | The core takes up and releases moisture as well as heat | Peaking at the joints, gaps along the run |
| Flexible LVT, dry back | 24–48 hours | Vinyl expands noticeably with temperature | Joints laid tight, then opening as the room cools |
| SPC rigid core, click | Commonly 24 hours; some instructions ask for 48, a few state none | The core is stable, but the wear layer and joint still move | Brittle tabs when cold, tight lay when hot |
| Glue-down LVT | 24–48 hours, including the adhesive | Open time and cure rate both depend on temperature | Adhesive failure, hollow spots, edge lifting |
Two rows deserve a caution. Where an instruction says no acclimation is needed, it usually means the material is already at room temperature when it arrives — not that it can be installed straight off a cold truck. And the glue-down figure includes the adhesive: an adhesive stored below its recommended application temperature will not develop the same bond however long the planks have waited.
Time is the least important variable, and it is the one everyone counts. These are the ones that decide the outcome.
- Temperature at floor level. Air near the ceiling can be 22 °C while the slab is 12 °C. A thermometer on the floor, or an infrared reading of the cartons, tells the truth.
- Cartons flat and off the floor. A stack standing on a cold concrete slab, or leaning against an uninsulated external wall, equilibrates to the wrong temperature and stays there.
- Cartons closed. Most instructions ask for the packaging to stay shut, to keep dirt and moisture out and to avoid uneven exposure of the top layer.
- Humidity. Relative humidity in the region of 40 to 65 per cent is the usual band. Very dry air increases static and can affect click friction; very damp conditions slow adhesive cure.
- Heating and cooling running. The building's systems should be on during acclimation, not switched on afterwards. A cold screed can hold the floor cold for days after the air has warmed.
- Underfloor heating off. The system should be off during acclimation and during installation, and ramped afterwards rather than switched straight to set point.
Acclimation prepares the plank; the expansion gap gives it somewhere to move. The two are part of the same specification, and a perfect acclimation with a blocked gap fails anyway.
The usual figure is 8 to 10 mm at walls, fixed objects and door frames, but the number that matters is the one in the instruction, which often scales with the length of the run. Many click systems also set a maximum uninterrupted dimension — commonly somewhere around twelve to fifteen metres — beyond which an expansion break or a transition profile is required. A long corridor with no break is a floor that will eventually fail at a doorway.
The gap is easy to lose at exactly the moments it matters. Skirting screwed through the floor, a door frame packed tight around the plank, a threshold bar fixed with no allowance beneath it, or a kitchen island built on top of the floor all remove the movement the design assumed. Underlay that is too thick has the same effect in the opposite direction, by letting the plank deflect at the joint; the trade-offs are covered in our guide to SPC underlayment.
The two ends of the temperature range produce opposite failures, and both look like product defects afterwards.
Cold. Vinyl stiffens below about 10 °C. Click tabs snap during fitting, planks do not seat fully, and the joints that do close will open again as the room warms and the floor expands. A winter handover in an unheated building is the classic case, and the failure usually appears two to three weeks after the installer has left.
Hot. Above roughly 30 °C the plank is slightly larger than the dimension it was tested at. Joints close easily, the floor is laid tight, and the perimeter gap may be consumed during fitting. When the building is occupied and cooled, the floor contracts and the joints separate along the longest run.
For underfloor heating, the commissioning sequence matters more than the set point. A common approach is to raise the flow temperature in steps of about 5 °C per day, hold at the design surface temperature, then cool down in the same steps before laying. The wider relationship between surface temperature and floor performance is covered in our note on SPC temperature limits.
Does SPC flooring need 48 hours to acclimate?
Not necessarily. Rigid core is more stable than laminate, and many instructions ask for around 24 hours at room temperature, while some state no acclimation is required. What none of them permit is installing material straight from a cold vehicle into a warm room. Check the instruction for the product and measure the material temperature rather than counting days.
Can the cartons stay in the garage overnight?
No. A garage is usually colder, damper and less stable than the building, so the material will equilibrate to the wrong conditions and then change again once it is carried inside. Cartons should be delivered to the room where they will be laid, flat, off the floor and away from external walls, with the building's heating or cooling already running.
How big should the expansion gap be?
Commonly 8 to 10 mm at walls, columns and door frames, but the governing figure is in the installation instruction, which often scales the gap with the length of the run and sets a maximum uninterrupted dimension before a break is required. The gap must then be protected: skirting fixed to the wall and not through the floor, and frames undercut rather than packed tight.